Crawler Mounted Drilling Rig

Crawler Mounted Drilling Rig

Application: crawler mounted drilling rig is suitable for mining, quarrying, railways, transportation, water conservancy and building materials. Drill medium-deep blasting holes for military and other open-pit projects and carry out high-efficiency rock drilling operations. It is also widely used in anchor bolt support, channel excavation, and drilling operations in sewerage projects.
Send Inquiry
Description

Introduction

 

 

1.sizes:7,370x2,360x2,560mm and 6050kg.

2.Application: crawler mounted drilling rig is suitable for mining, quarrying, railways, transportation, water conservancy and building materials. Drill medium-deep blasting holes for military and other open-pit projects and carry out high-efficiency rock drilling operations. It is also widely used in anchor bolt support, channel excavation, and drilling operations in sewerage projects.

3.Ability: Professional R&D capability, capable of making reasonable modifications based on different customer demands.

 

Details

 

 

Crawler mounted drilling rig to cater to the market demand the development of a new type of DTH drill rig, the excellent product performance, flexible operation, complete function, adaptability, has high cost performance. Crawler mounted drilling rig is through the mechanism of energy conversion engine driven hydraulic pump, can convert mechanical energy into hydraulic oil pressure (pressure 20.6 MPa or higher), through the closed-loop oil transfer to the actuators. Double rotation directional valve controlled motor to realize stepless variable speed (0-120 RPM), push oil cylinder precision adjustment wob DTH drilling mode impact - rotating composite rock impact device directly into the bottom of the hole hammer rock (> 1800 times/min), synchronous rotary bit cutting rock mass. Enhance the torsional strength, triangular drill pipe diamond bit for hard rock (rock hardness f 10 or less). Slag discharge with high pressure air blow out by hollow drill cuttings, and protecting with pipe drilling process to prevent the collapse hole water-eroded cave area.

8

Specification Parameters

 

 

common parameter

Depth of drilling

10m-50m

Drill pipe specification

Φ89-3,000mm

Diameter of drill hole

Φ90-400mm

With impactor

4"/5"/6"8"10"

Maximum working torque

7600N.m

Speed of rotation

0-100rpm

Working wind pressure

0.7-2.9 Mpa

Gas consumption

10-25m3/min

Force of propulsion

30kN

Force of lift

65kN

Walking speed (Max)

3km/h

Hill climbing ability

30º

Total weight

6050kg

Transport size (LxWxH)

7,370x2,360x2,560mm

Diesel engine parameters

   

Drilling rig model

Power

rated power

KZ450

Yuchai YC4DK100

73.5kW

 

Uses

 

 

Crawler mounted drilling rig can be widely applied in mining operations: drilling blasting holes, exploration holes, gas drainage holes and drainage holes, and adapting to complex terrains in open-pit or underground areas.

Gas control: directional drilling in the coal mine construction, coal seam water injection, outburst prevention unloading, drain, etc.), narrow roadway work ability outstanding.

Multifunctional drilling: all-round Angle adjustment (level 0-180 °, pitch + 90 °), support for multiple process.

 

Features

Crawler mounted drilling rig to sell two matching scheme: mountain hoist, dust collector to reasonable choice (according to the customer site) we provide after-sales services such as the machine warranty for three months, according to customer demand matching reasonable consumables, variety of actual scenario plan for reasonable modification.

Contact

We sincerely invite you to choose the crawler mounted drilling rig series - an efficient engineering solution specially designed for complex working conditions. This product is highly efficient in power, of high quality and low price, providing you with satisfactory service!

FAQ

 

Q: Abnormal pressure fluctuations in the hydraulic system?

A: Reason: hysteresis (pressure relief valve card < 18 mpa) or hydraulic pump discharge (volumetric efficiency < 80%) solution: clean/replace relief valve, wear testing pump body sealing and replace components.

Q: Is the power head rotating weakly?

A: Check items: the guide oil plug (pressure < 1.5 MPa) or the motor bearing damage (sound) measures: dredge the guide line or replace the hydraulic motor.

Q: What should be noted when starting up for the first time?

A:Check the hydraulic oil tank (liquid level in oil standard about two-thirds required), crawler tensioning degree (prolapse 30-50 mm) and battery voltage (24 v or higher). No-load running for 10 minutes, observe whether the hydraulic system pressure is stable (20.6 + / - 0.5 MPa.

 

Hot Tags: crawler mounted drilling rig, China crawler mounted drilling rig manufacturers, suppliers, factory, rotary hammer drill bits for rock, air leg rock drill, drill press for rocks, 3 inch rock drill bit, Crawler Mounted Drilling Rig, top rock drilling

Send Inquiry